Choose a location in the vicinity of the installation before removing the protective materials.
After opening, if the unit is damaged, repack the unit as it was shipped to you. RETAIN ALL PACKING MATERIALS. In general, freight damage claims
will be denied if the original packing materials are not retained for the claims adjustor to inspect. Call your supervisor on how to proceed with filing a
freight claim and to order a replacement unit.
1. Before opening, check the unit model number on the box. Verify it is the correct capacity, unit type and voltage. Refer to Nomenclature
Chart on page 10 of this manual.
2. Place the box on a solid surface right side up.
3. Cut the white reinforced nylon straps.
4. Open the top of the box and fold back all four flaps.
5. Remove the protective cardboard.
6. The walls and top panels are not attached to the bottom of the box. Lift the cardboard carton by the flaps and remove the box walls and
top and place it to the side.
7. Remove the moisture barrier plastic bonnet.
8. Check the unit nameplate data and model number. Verify the unit voltage, and capacities are correct before proceeding.
9. Remove and retain the installation manual. It is located under the unit, on top of the unit, or taped and inserted inside the unit cabinet.
10. Lift the unit (but not by refrigerant piping!) and inspect for freight damage. If damage is found, repack the unit as it was received in the
original container.
DO NOT lift the unit by the refrigerant piping. Use the hanger brackets or the unit case only to lift the unit. Damage to the piping components may occur.
location selection
Select a location for installing the unit where:
• The location is indoors in a conditioned space and protected from outdoor weather events.
• The mounting structure will support the weight of the unit(s), piping, and accessories.
• The unit is level.
• Space is allocated for heat exchanger maintenance and draining.
• Space is allocated for the connection of necessary piping.
• Proper electrical panel clearance requirements are satisfied.
• The unit is not exposed to steam, humid air, caustic, and/or acidic
chemical vapors such as but not limited to Chlorine or Muratic acid.
• Provide minimum maintenance clearance and electrical component service areas as shown in Figure 7
• Refer to Table 6 for clearance measurements specific to each chassis.

Unpack the Indoor Unit / Inspect for Freight Damage

Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG Life's Good" is a registered trademark of LG Corp.

rouGHING-IN

19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arnh763k3b2

Table of Contents