Installing A Hsc5 Hot-Swap Cage - AOpen Fortress 9500 User Manual

Table of Contents

Advertisement

F
o
r
t
r
e
s
s
9
5
0
0
/
9
F
o
r
t
r
e
s
s
9
5
0
0
/
9

1.5.1 Installing a HSC5 Hot-Swap Cage

To install the hot-swap cage into the housing:
1.
Open the front panel door and remove the side panels. See
page 38 for more information.
2.
Attach two pairs of drive rails on each side of the hot-swap cage. Secure the rails with eight
screws.
3.
Insert the hot-swap cage into the drive bays and secure the hot-swap cage with four screws.
3
0
0
3
0
0
49
O
n
l
i
n
e
M
a
n
u
a
O
n
l
i
n
e
M
a
n
u
a
"Opening the housing
panels" on
A
Open
l
l

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortress 9300

Table of Contents