Tools And Materials Required; Remove The Packaging - GE MONOGRAM ZV950 Installation Instructions Manual

36" stainless steel vent hood
Hide thumbs Also See for MONOGRAM ZV950:
Table of Contents

Advertisement

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)
• Tape measure
• Knife
• Spirit level
• Wire cutter/stripper
• Wire nuts
• Electric drill with 1/8" and 3/8" bits
• Phillips and flat blade screwdrivers
• Hammer
• Pliers

REMOVE THE PACKAGING

The vent hood is shipped secured to a shipping board
with a shipping bracket and 4 screws.
• Remove the duct cover, parts box and other packaging.
• Lift the hood out of the box.
• Remove and properly discard the plastic wrapping.
Junction
Top Shipping Screws
Box
• Locate and remove 2 screws at the top of the hood.
Remove 2 screws at the bottom behind the filter
guides on the left and right sides. Remove the
124Dia3
shipping bracket from behind the blower housing.
Discard the shipping bracket and board.
Installation Preparation
• Safety glasses
• Duct tape
• Tape to mount template
• Gloves to protect against sharp edges
• 120V 60Hz. 15 or 20 Amp, 2 wire with ground.
Properly grounded branch circuit.
• Strain relief for junction cover.
• 8" round metal duct, length to suit installation.
Top Of Hood
Remove Bottom Shipping
Screws and Shipping Bracket
• Remove junction box cover.
• Install strain relief into junction box cover.
7
Shipping Board
124Dia4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents