CRANKSHAFT PULLEY
REMOVAL AND INSTALLATION
Pre-removal Operation
D
Under Cover Removal
2
Removal steps
1. Drive belt (Power steering and
A/C)
ENGINE <4G6> -
3
25 Nm
Crankshaft Pulley
Post-installation Operation
D
Drive Belt Tension Adjustment (Refer to P.11A-6.)
D
Under Cover Installation
1
2. Drive belt (Alternator)
3. Crankshaft pulley
11A-15
11200160303