Figure 1-2 Recommended Locations For Mounting A Conductivity Cell; Figure 1-3 Two Piping Arrangements For The Cell - Honeywell 04973 Series Installation And Maintenance Manual

Conductivity cells
Table of Contents

Advertisement

Process

Figure 1-2 Recommended Locations for Mounting a Conductivity Cell

10/07
Preferred
Cell Locations
Pump
(a) Cell Mounted in 3/4" NPT Pipe Tee* (Customer Supplied)
(b) Cell Mounted in PES Flow Chamber

Figure 1-3 Two Piping Arrangements for the Cell

Installation and Maintenance Manual
Cool er
*Maximum allowable operating temperature
for piping arrangements depends on the
type of pipe tee chosen.
Flow
Introduction
a/n 23340
Flow
a/n 23341
3

Advertisement

Table of Contents
loading

Table of Contents