Tools And Materials Required; Remove The Packaging - GE Monogram ZV800 Installation Instructions Manual

36” chimney vent hood
Hide thumbs Also See for Monogram ZV800:
Table of Contents

Advertisement

TOOLS AND MATERIALS REQUIRED

)
(NOT SUPPLIED
Tape measure
Knife
Spirit level
Wire cutter/stripper
Wire nuts
Electric drill with 1/8" and 3/8" bits
Phillips and flat blade screwdrivers
Hammer
Pliers
Safety glasses
Duct tape
Tape to mount template
Gloves to protect against sharp edges
120V 60Hz. 15 or 20 Amp, 2 wire with
ground Properly grounded branch circuit
Strain relief for junction cover
6" round metal duct, length to suit
installation
Saw or jig saw
Conduit for house wiring
and conduit connector

REMOVE THE PACKAGING

• Remove the duct cover, parts box and other
packaging.
Installation Preparation
Measuring Tape
Pliers
Duct Tape
Strain relief for
junction cover
Wire nuts
2-piece duct
cover
Spirit level
Electric drill
with 1/8" and
3/8" Bits
Safety glasses
Phillips
head
screwdriver
Masking tape
• Lift the hood out of the box.
• Remove and properly discard the plastic wrapping.
• Remove junction box cover.
6
Gloves
Knife
cutter/stripper
Flat blade
screwdriver
Saw or jig saw
Conduit
Wire
Hammer

Advertisement

Table of Contents
loading

Table of Contents