Step 4, Prepare The Hood; Step 5, Mount The Hood - GE Monogram ZV800 Installation Instructions Manual

36” chimney vent hood
Hide thumbs Also See for Monogram ZV800:
Table of Contents

Advertisement

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE
4
PREPARE THE HOOD
• Remove the hood from the box. Remove packaging
and tape.
Electrical
panel
• Remove one screw on each side of the cover on the
electrical panel. Lift off the cover and set aside with
screws.
• Stand the electrical panel upright.
• Align the screw holes in the bottom of the panel with
the holes on the base of the hood at the front side.
• Install 3 screws provided.
• Snap the damper into the
exhaust outlet on the top
of the hood.
Installation Instructions
Remove 2 side
cover screws
Junction box
Inside screw
Secure
electrical panel
with 3 screws
Install
damper
5
MOUNT THE HOOD
Install a wood screw
on each side of the
mounting frame
• Lift the hood onto the mounting bracket.
• Check to be sure it is level.
• Install wood screws through the hood and into the
wall on each side of the mounting bracket.
• Extend the canopy forward for better access to the
rear mounting screw holes.
• Install 2 wood screws or fasteners through the
bottom of the hood into the wall.
11
Install bottom
mounting
screws
Mounting
bracket

Advertisement

Table of Contents
loading

Table of Contents