Installation Instructions

Note: Cost of installation and any subsequent fine-tuning is the responsibility of the buyer.
Warning: Read follow installation instructions before plugging in machine to an electrical outlet.
1. Remove the machine from shipping carton. It is strongly recommended to perform a visual inspection of the
machine inside out checking for loose connections on either control board or for damage to outlet valve that
might have been caused by mishandling during shipment. Please keep carton and packing in case the machine
needs to be re-shipped.
2. Plumb in the brewer. Caution: Power to the machine must be off before proceeding with installation.
Flush water lines before installing machine. Machine should be connected to cold water line for best
operation. Check incoming water pressure with pressure gauge.
Water pressure should be at 20 lbs. For less than a 25 foot run, use 1/4" OD copper tubing and connect to
a 1/2" or larger water line. For more than a 25 foot run, use 3/8" OD copper tubing from a 1/2" or larger
water line. Use a adaptor fitting for the connection to the machine.
If the water pressure is 50 lbs or greater, it is strongly recommended to install a water regulator and set the
water pressure below 50 lbs. This will prevent erratic brew levels.
Connect the incoming water line to the incoming main fitting [3/8 NPT x 1/4 F male] on the back of the
machine.
Provide individual water line(s) to each machine when there are multiple machines in use.
Note: A shut off valve should be installed on the incoming water line in a convenient location.
3. Place empty server under brew basket.
4. Plug in to proper voltage circuit and turn the power on.
5. Water will fill automatically begin to fill the tank.