Drive Sprocket; Engine Installation - Yamaha TT-R125(N) Owner's Service Manual

Table of Contents

Advertisement

ENGINE REMOVAL
REMOVAL POINTS

Drive sprocket

1. Remove:
Bolt (drive sprocket)
Drive sprocket holder 1
Drive sprocket 2
Drive chain 3
NOTE:
Remove the drive sprocket together with the
drive chain.
Engine removal
1. Remove:
Engine 1
From left side.
NOTE:
Make sure that the couplers, hoses and cables
are disconnected.
ASSEMBLY AND INSTALLATION

Engine installation

1. Install:
Engine 1
Install the engine from left side.
Engine mounting bolt (rear) 2
Engine bracket (front) 3
Bolt (engine bracket) 4
Engine mounting bolt (lower) 5
Engine mounting bolt (front) 6
Engine bracket (upper) 7
Engine mounting bolt (upper) 8
Bolt (engine bracket) 9
4 - 63
ENG
40 Nm (4.0 m · kg, 29 ft · lb)
40 Nm (4.0 m · kg, 29 ft · lb)
40 Nm (4.0 m · kg, 29 ft · lb)
40 Nm (4.0 m · kg, 29 ft · lb)
40 Nm (4.0 m · kg, 29 ft · lb)
40 Nm (4.0 m · kg, 29 ft · lb)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tt-r125lwnTt-r125Tt-r125lw

Table of Contents