If Something Goes Wrong

Before You Call For Service

Problem
Oven will not
start
Floor of the oven is
warm, even when
the oven has not
been used
"LOCKED" appears
on display
You hear an
unusual, low-tone
beep
"SENSOR ERROR"
appears on display
Food amount too
large for Sensor
Reheat
"BAD PROBE" or
"PLEASE INSERT
PROBE" appears
on display
42
Possible Cause
A fuse in your home
may be blown or the
circuit breaker tripped.
Power surge.
Plug not fully inserted
into wall outlet.
Door not securely closed. • Open the door and close securely.
Heat from the cooktop
light may make the oven
floor get warm.
The control has been
locked.
You have tried to start
the Reminder without
a valid time of day.
You have tried to change • Many of the oven's features are preset
the power level when it is
not allowed.
When using a Sensor
feature, the door was
opened before steam
could be detected.
Steam not detected
in maximum amount
of time.
Sensor Reheat is for
single servings of
recommended foods.
Probe has been
forgotten or may not be
inserted properly into
oven outlet.
The probe is defective.
What to Do
• Replace fuse or reset circuit breaker.
• Unplug the microwave oven, then plug
it back in.
• Make sure the 3-prong plug on the
oven is fully inserted into wall outlet.
• This is normal.
• Press and hold CLEAR/OFF for
about 3 seconds to unlock the control.
• Start over and enter a valid time
of day.
and cannot be changed.
• Do not open door until steam is
sensed and time is shown counting
down on display.
• Use Time Cook to heat for more time.
• Use Time Cook for large amounts
of food.
• Insert the probe properly into the
oven wall outlet.
• Replace the probe.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Spacemaker EVM1750 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Spacemaker hvm1750Spacemaker jvm1750Spacemaker lvm1750

Table of Contents

Save PDF