Time Features
Express Cook
Add 30 Seconds
This is a quick way to set
cooking time for 1–6 minutes.
Press one of the Express
Cook pads (from 1 to 6)
for 1 to 6 minutes of
cooking at power level 10.
For example, press the
2 pad for 2 minutes of
cooking time.
You can use this feature
two ways:
• It will add 30 seconds to
the time counting down
each time the pad is
pressed.
The power level can be
changed as time is
counting down. Press
POWER LEVEL and
enter 1–10.
• It can be used as a quick
way to set 30 seconds of
cooking time.
19
Need help?
Do you have a question about the Spacemaker EVM1750 and is the answer not in the manual?
Questions and answers