Quick Start

The Controls on Your Microwave Oven
(Throughout this manual, features and appearance may vary from your model.)
You can microwave by time, temperature, preset time and power level or with the
convenience features.
1
Time Features
Time Cooking
Press
TIME COOK I & II (Press once or twice)
DEFROST AUTO/TIME (Press twice)
EXPRESS COOK
POWER LEVEL
ADD 30 SEC
Defrosting by Weight
Press
DEFROST AUTO/TIME (Press once)
2
Custom Cooking
Cooking by Preset Cooking Time and Power Level
Press
CUSTOM (Press and hold for 2 seconds)
1
(On some models)
Enter
Amount of cooking time.
Amount of defrosting time.
Starts immediately!
Power level 1–10.
Starts immediately!
Enter
Food weight
Enter
Amount of cooking time and power level.
2
11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Spacemaker EVM1750 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Spacemaker hvm1750Spacemaker jvm1750Spacemaker lvm1750

Table of Contents

Save PDF