Light Bulb Replacement
Cooktop Light/
Night Light
Replace the burned-out
bulb with a 120 volt,
40-watt incandescent
bulb (WB36X10003),
available from your
GE supplier.
Oven Light
Replace the burned-out
bulb with a 120 volt,
40-watt incandescent
bulb (WB36X10003),
available from your
GE supplier.
1 To replace the bulb(s),
first disconnect the power
at the main fuse or circuit
breaker panel or pull
the plug.
2 Remove the screw at the
left of the light cover
and lower the cover.
1 To replace the oven light,
first disconnect the power
at the main fuse or circuit
breaker panel or pull
the plug.
2 Remove the top grille by
taking out the 2 screws
that hold it in place.
3 Be sure the bulb(s) to be
replaced are cool before
removing. After breaking
the adhesive seal, remove
the bulb by gently
turning. Replace with the
same size and type bulb.
4 Replace the screw.
Connect electrical power
to the oven.
3 Next, remove the screw
located above the door
near the center of the
oven that secures the
light housing. After
breaking the adhesive
seal, remove the bulb by
gently turning. Replace
with the same size and
type bulb.
4 Replace the screw.
Connect electrical power
to the oven.