Surface Light
Beeper Volume
Auto Nite Light
Press to turn the surface
light on or off.
The beeper sound level
can be adjusted. Press
BEEPER VOLUME.
Choose 0–3 for mute
to loud.
You can set the night
light to turn on and off
automatically at any time
you want.
1 Press AUTO NITE
LIGHT.
2 Enter the time you want
the light to turn on.
Select AM or PM.
3 Press AUTO NITE
LIGHT again and enter
the time you want the
light to turn off. Select
AM or PM.
4 Press AUTO NITE
LIGHT.
On some models, there is
a night light option.
Press SURFACE LIGHT
once for bright light, twice
for the night light or three
times to turn the light off.
NITE will stay lit to remind
you that the feature is set.
You can review the Auto
Nite Light settings by
pressing AUTO NITE
LIGHT.
To erase your settings
and turn off the automatic
feature, press AUTO NITE
LIGHT, then 0.
33
Need help?
Do you have a question about the Spacemaker EVM1750 and is the answer not in the manual?
Questions and answers