Operating Instructions
Other Features Your Model May Have
Shelf
How to Use the Shelf
When Microwaving
• Make sure the shelf is
positioned properly
inside the microwave
to prevent damage to
the oven from arcing.
• Do not use a microwave
browning dish on the
shelf. The shelf could
overheat.
• Do not use the oven
with the shelf on the
microwave floor. This
could damage the
microwave.
• Use pot holders when
handling the shelf—
it may be hot.
• Do not use the shelf
when cooking
popcorn.
• Do not use the shelf
with Sensor Cooking
or Reheat.
34
Food microwaves best
when placed on the
turntable or on the shelf
in the lower position.
Only use the shelf when
reheating on more than
one level. Do not store the
shelf inside the oven cavity.
The shelf gives you the
option to reheat more
than one dish of food at
the same time.
Need help?
Do you have a question about the Spacemaker EVM1750 and is the answer not in the manual?
Questions and answers