Automatic Cooking - GE Spacemaker EVM1750 Owner's Manual

Ge spacemaker microwave oven owner's manual
Hide thumbs Also See for Spacemaker EVM1750:
Table of Contents

Advertisement

Convenience Features
Snacks
Snacks Guide
Food Type
1 Bread, rolls, muffins
2 Sandwiches
3 Pizza (leftover slices)
4 Dessert toppings
5 Soup
6 Cheese dip
(On some models)
The Snacks feature
automatically sets the
microwaving times and
power levels to warm a
variety of snack foods.
1 Press SNACKS.
2 Select snack type 1–6
(see the Snacks Guide
below).
Quantity or Weight
3 Enter the number of
items or the food weight
in ounces.
4 Press START.
Hint: You can press
and hold the SNACKS pad
during cooking to display
the snack type and
remaining microwaving
time.
1 to 4
1 to 2
1 to 4
1 to 4
8 to 40 oz.
4 to 16 oz.
21

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Spacemaker EVM1750 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Spacemaker hvm1750Spacemaker jvm1750Spacemaker lvm1750

Table of Contents

Save PDF