HP 5400 zl Installation And Getting Started Manual page 45

5400 zl series
Hide thumbs Also See for 5400 zl:
Table of Contents

Advertisement

E q u i p m e n t
If you are installing the switch in an equipment cabinet, in place of the
C a b i n e t
12-24 screws supplied with the switch, use the clips and screws that came with
N o t e
the cabinet. Plan which four holes you will be using in the cabinet and install
all four clips and partially install the two bottom screws, as described in step
2 on the previous page, before proceeding to step 3.
W A R N I N G
For safe operation, please read the "Installation Precautions" on
2-4
1.
8 mm
M4 screws
Figure 2-7. Attaching brackets to the 5400 zl switch
and
page 2-5
before mounting the switch.
Use a #1 Phillips (cross-head) screwdriver and attach the mounting
brackets to the switch with the included 8-mm M4 screws.
For the 5406 zl switches, each bracket is attached with four screws as
shown in the following illustration.
Although these procedures show the 6-slot chassis, the procedures are
the same for the 12-slot chassis.
Installing the HP 5400 zl Switches
Installation Procedures
page
2-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5406 zl5412 zl

Table of Contents