23.2)
REMOVAL OF GAS VALVE AND MANIFOLD ASSEMBLY
23.3)
AIR SWITCH PRESSURE CHECK
1. Open hinged access panel.
2. Add tubing to connect the air switch tubing P1 + and P2 - with the connector tees and the probes P1+ and P2+.
Form #43343530
July 08
–47–