Removing Gas Valve And Manifold Assembly; Air Switch Pressure Check - Space-Ray PTS Series 100 Installation And Operation Instructions Manual

Infrared radiant tube heater two stage push through system (positive pressure)
Table of Contents

Advertisement

23.2)
REMOVAL OF GAS VALVE AND MANIFOLD ASSEMBLY
23.3)

AIR SWITCH PRESSURE CHECK

1. Open hinged access panel.
2. Add tubing to connect the air switch tubing P1 + and P2 - with the connector tees and the probes P1+ and P2+.
Form #43343530
July 08
–47–

Advertisement

Table of Contents
loading

Table of Contents

Save PDF