Inserting Turbulators - Space-Ray PTS Series 100 Installation And Operation Instructions Manual

Infrared radiant tube heater two stage push through system (positive pressure)
Table of Contents

Advertisement

4. Slide the next tube into the coupling.
5. Make sure both tube ends are butted together.
6. Finish tightening both bolts to 40-60 ft.lbs. torque to ensure a complete seal.
7. Use the two Self-drilling screws through the pre-punched holes to secure the tubes in the coupling.
8. Check to ensure that the hardware is completely closed and the band is seated on the reaction block and
interference pins as illustrated above.
9. Once all the heater body sections are attached, make sure that the heater system is level. If it is not, slight
adjustments can be made using the turnbuckles. (See Section 9.0)
10.2)

INSERTING TURBULATORS

1. Assemble the turbulators together by interlocking the slotted end portions. Slide these into the last tube
section until they are flush with the tube end. Note: Refer to the table below for quantities of turbulators
required for each heater model.
IMPORTANT: NEVER REUSE A COUPLING.
coupling only and torque as per instructions above and the diagrams
above.
–20–
Always install a new
Form #43343530
JJuly 08

Advertisement

Table of Contents
loading

Table of Contents

Save PDF