Download Print this page

GE Monogram ZET857SYSS Installation Instructions Manual page 5

30" convection built-in ovens
Hide thumbs Also See for Monogram ZET857SYSS:

Advertisement

Cabinetry
30"
t_uill-I_
( o_veclio_
Ove_s
Tools
and
materials
required
Framed
cabinet
double
oven
• 2"x 4" lumberfor runners
• Saw
• Level
• Phillips screwdriver, wood screws and adhesive or other
hardware for installing runners or shelf to support oven.
Ovensare designedfor installation in a cabinet 30" rain. wide.
• Out 2" x 4" runners of appropriate length or solid shelf to
support oven.
• Attach runnersor solid shelf in opening as shown.
• Runnersmust be level, rigidly mounted and capable of
supporting 3(}0pounds.
Front Framed
Partial OverlayDoor
Front FramedFull
Overlay Door
Allow 3/4" Overlap
on Sides.Allow
1"Min. for Top
Overlapand Clearance.
Allow 1/4" at Bottom
for Clearance.
23-1/2"Min.
_"Recommended
Use the inlormation
in this dimension
drawing tor
typical trained cabinets. The tvont titce of"the oven
will be f]ush with cabinetry doors or drawers.
Order a double oven cabinet.
Rough opening for double oven must be:
• I)epth--23-1i2"
min. fiom inside back to tront of
cabinet fl-ame.
• Width--28"
rain., 28-3/8" max.
• Height--47-5/8"
rain., 47-3/4" max.
Allow Minimumof 17-3/4"for Clearance
to AdjacentCorners,Drawers,or Walls, etc.
• Installing
12" from
floor will place base of upper
i)verl
at
cotnlteltop
level.
-May
be more
than
12" from
floor, depending
upon
user preference.
• These
Monogram
ovens
require
3/4" overlap
to
both
sides. Allow 1" rain.
fbr top overlap
and
clearance
to upper
doors.
• t)ven
overlaps
will conceal
raw edges
on the top and
both
sides of the cutout.

Advertisement

loading