Chapter 3
Maintaining the Server

Additional CPU-Related Parts To Order With RMA Replacement Motherboards

When a return material authorization (RMA) of the motherboard or CPU is done on a Cisco UCS
C-series server, there are additional parts that might not be included with the CPU or motherboard spare
bill of materials (BOM). The TAC engineer might need to add the additional parts to the RMA to help
ensure a successful replacement.
A CPU heatsink cleaning kit is good for up to four CPU and heatsink cleanings. The cleaning kit contains
two bottles of solution, one to clean the CPU and heatsink of old thermal interface material and the other
to prepare the surface of the heatsink.
New heatsink spares have preinstalled thermal interface material covered by a small sheet of plastic. It
is important to clean the old thermal interface material off of the CPU prior to installing the heatsinks.
Therefore, when ordering new heatsinks it is still necessary to order the heatsink cleaning kit at a
minimum.
OL-25760-01
Scenario 1—You are re-using the existing heatsinks:
Heat sink cleaning kit (UCSX-HSCK=)
Thermal grease kit for C220 (UCS-CPU-GREASE2=)
Intel CPU Pick-n-Place tool: UCS-CPU-EP-PNP= for 10-, 8-, 6-, 4-, or 2-core CPUs (green);
or UCS-CPU-EP2-PNP= for v2 12-core CPUs (purple)
Scenario 2—You are replacing the existing heatsinks:
Heat sink (UCSC-HS-C220M3=)
Heat sink cleaning kit (UCSX-HSCK=)
Intel CPU Pick-n-Place tool: UCS-CPU-EP-PNP= for 10-, 8-, 6-, 4-, or 2-core CPUs (green);
or UCS-CPU-EP2-PNP= for v2 12-core CPUs (purple)
Installing or Replacing Server Components
Cisco UCS C220 Server Installation and Service Guide
3-29