Heater; Installation Checklist - Kenmore 153.331350 Use & Care Manual

40 u.s. gal (151 litres)/50 u.s. gal (189 litres) residential gas water heater
Table of Contents

Advertisement

This gas water heater was manufactured to voluntary safety standards to reduce the likelihood of a
flammable vapor ignition incident. The new technology used in meeting these standards makes this
product more sensitive to installation errors. Please review the following checklist and make any required
installation upgrades or changes.
Questions? Contact Sears at 1-800-4-MY-HOME
(1-800-469-4663).
Installation
Checklist
NOTE: Use and complete this checklist before
lighting the heater. Correct any conditions that do
not meet these instructions.
Water Heater Location
[]
Centrally located with the water piping system.
Located as close to gas piping and vent pipe
system as possible.
[]
Located indoors and in a vertical position.
Protected from freezing temperatures.
[]
Proper clearances from combustible surfaces
maintained and not installed directly on a
carpeted floor.
[]
Provisions made to protect the area from water
damage. Metal drain pan installed and piped to
an adequate drain.
[]
Installation area free of corrosive elements and
flammable material.
[]
Sufficient room to service the water heater.
Gas Supply and Piping
[]
Gas supply is the same type as listed on the
water heater data plate.
[]
Gas line equipped with shut-off valve, union
and dirt leg
[]
Approved pipe joint compound used.
[]
Adequate pipe size and of approved material.
[]
Chloride-free soap and water solution or other
approved means used to check all connections
and fittings for possible gas leaks.
Water System Piping
[]
Temperature and Pressure relief valve properly
installed with a discharge line run to an open
drain and protected from freezing.
[]
All piping properly installed and free of leaks.
[]
Heater completely filled with water.
[]
Closed system pressure build-up precautions
installed.
Vent Pipe System
[]
Vent pipe and fittings of approved material.
[]
Acceptable size, length and number of elbows
on exhaust vent system.
[]
Installed in accordance with prevailing
provisions of local codes, or in the absence of
such, the latest edition of "National
Fuel Gas
Code" ANSI Z223.1 (NFPA 54).
[]
Horizontal piping slopes at an upward pitch of
1/8 in. (3mm) rise per 4 ft. (1.2m) away from
the water heater.
[]
Not obstructed in any way.
Vent Termination
Horizontal
[]
12 in. (300mm) min. above grade/snow level.
[]
Away from corners, other vents, windows etc.
Vertical
[]
Exhaust vent termination 18 in. (457mm) min.
above roof/snow level.
Electrical Connections
[]
Unit connected to a dedicated 120V electrical
supply.
[]
Proper polarity.
[]
Water heater properly grounded.
[]
Installed in accordance with prevailing
provisions of local codes, or in the absence of
such, the latest edition of "National
Electrical
Code" (NFPA 70)".
After all actions on checklist are checked/
completed, read the Lighting Instructions and
proceed with lighting the heater.
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

153331360

Table of Contents