Armstrong 6100 Installation, Operation And Maintenance Instructions page 16

Table of Contents

Advertisement

Unit Configuration
Enter Password ARMH
Run Mode
Contactor Count
Control Type
Power Settings
EOL Reset
Failure Record Clear
User Password Reset
Temperature Compensation
Water Compensation
Heater Compensation
Start-Up Procedure (Before "Power On")
1. Examine the electrical compartment for any loose or disconnected component wiring. Check all
high voltage screw terminal connections at contactor, terminal strip, fuse block & power module for
tightness.
2. Remove Side Panel. Remove tank access panel by unscrewing all wing nuts. Make sure all
ionic beds are fastened securely to mounting pins. Position access panel on tank making sure the
gasket is in place and tighten all wing nuts. Note: Ionic beds not used on DI/RO units.
3. Check and recheck incoming voltage source and control wiring for proper connections and
tightness of connections.
4. Turn on water supply and check for leaks.
5. Make sure access doors and panels are secure.
Run (Default)
Test
1
2
3
4
PWM (Default)
On/Off
1000 W
3000 W
5000 W
6650 W
8000 W
Clear Ionic Time
Confirm Cancel
Clear Failure List
Confirm Cancel
User Password Reset
Confirm Cancel
Factory Use Only
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents