Program And Loop Switch Test - Fujitsu SRS-1050 User Manual

Isdn digital set
Hide thumbs Also See for SRS-1050:
Table of Contents

Advertisement

SRS -1050 Testing (
SELF TEST (MEMORY/LINE)
VOICE & DATA ALL GOOD
Program and Loop Switch
Test
If your SRS-1050 has the optional
data terminal adapter, pressing 5
displays the status of the Program
(PRG) and Loop switches that are
a part of the TA. The display
looks like this:
SELF TEST
(PROGRAM SW/LOOP SW)
PROG RAM: OFF LOOP:NOR
Display Message
S/M ERROR CODE (01)
S/M ERROR CODE (02)
S/M ERROR CODE (03)
S/M ERROR CODE (04)
S/M ERROR CODE (05)
S/M ERROR CODE (06)
S/M ERROR CODE (07)
S/M ERROR CODE (07)
RCM (02)
RCM ERROR CODE (01)
RCM ERROR CODE (02)
VOICE ALL GOOD
VOICE & DATA ALL GOOD
Page C-4
Table C-1 Self-Test Result Codes
Pressing the Program switch on
the back of the set changes
PROG RAM: OFF to PROG
RAM: ON. Pressing the Loop
switch changes LOOP: NOR to
LOOP: TEST. See your Data
User's Guide for the function of
these switches.
Exiting Test Mode
To exit test mode, remove power
and reapply it.
Test Result
SMCM, RAM, ROM test failed.
Line SIU test failed.
Line SIU test timed out.
Line NT test failed; message received
does not match message sent.
Line NT test timed out.
Line NT test failed; no response
received.
SMCM test timed out.
SMCM, RCM test timed out.
RCM RAM test failed.
RCM test timed out.
All tests passed.
All tests passed (with data terminal
adapter).
Appendix C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents