Chassis Physical Design - Dell Force10 S2410-01-10GE-24P Quick Start Manual

Dell force10 s2410 system quick start guide
Hide thumbs Also See for Force10 S2410-01-10GE-24P:
Table of Contents

Advertisement

Step
Task
Position the XFP so it is in the upright position (XFPs on the bottom
1
(even-numbered ports) are upside down; odd-numbered ports (on top)
install right-side up), with the bail latch on top in the closed position, as
shown here. For details on XFP installation, see the instruction that
accompanies the XFP.
Insert the XFP gently into the port until it snaps into place. (The design
2
of the XFP prevents it from seating incorrectly.)
The XFP transceiver contains Rx and Tx labels on the two fiber optic
3
connections, and the connections have keyways that prevent inserting
the cables incorrectly.
CAUTION: Before connecting a transceiver to a source, check the receive
power of the transceiver with an optical power meter. Generally, Dell Force10
specified optics are not to be subjected to receive power higher than that
stipulated by the optic specification. If the optic is exposed to optical power in
excess of the specification, there is a high likelihood that it will be damaged.
Optical specifications for Dell Force10 branded devices are at the following
URL: http://www.force10networks.com/products/mediaspecifications.asp
S2410 Specifications

Chassis Physical Design

Parameter
Height
S2410P
1.73 inches (4.4 cm)
S2410CP
1.73 inches (4.4 cm)
Installing the Hardware
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Force10 s2410

Table of Contents