NEC Express5800/320Fd-LR User Manual page 46

Nec servers user's guide
Hide thumbs Also See for Express5800/320Fd-LR:
Table of Contents

Advertisement

3-6 Installing Server
Checking the place to install
Decide the place (height) to install. To keep
balance, install it as low as you can on the rack.
To install the rack, the height for 4U is required.
IMPORTANT:
To install this device to the rack, the space for 1U is required for installing the USB
compatible floppy disk drive, in addition to the space for 4U.
Next to the square hole of the rack, an imprinted mark is placed for 1U (This is the unit to show the
height of the rack). This device is as high as 4U (about 176 mm), so install it between the imprinted
marks that indicate the height of 4U.
Installing this device
Follow the steps below to set the 4U chassis to the rack.
Front side of 4U chassis
IMPORTANT:
4U chassis weighs about 10 Kg. To mount, remove or replace it, be sure to hold it with two
or more people.
The following are the required accessories. Check if you have them all.
Tool Name
- Bracket
- Panhead screw
- Washer for panhead screw
- Plate screw (short)
- Plate screw (long)
- Washer for plate screw
Imprinted mark (2
imprinted marks for
5Us)
Places to install
core nuts
Imprinted mark
Back side of 4U chassis
Qty
2
4
4
8
4
12
4U (the height
for installing this
device)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/320fd-mrN8800-124fExp320jN8800-125fExp320k

Table of Contents