Table Of Contents - NEC 455-01593-000 Installation Manual

Redundant power upgrade kit
Table of Contents

Advertisement

Redundant Power Upgrade
Installation Procedures
This guide contains the information necessary to install, test, and troubleshoot
(if necessary) the Redundant Power Upgrade. This guide is written for
knowledgeable users, trained customer engineers, system analysts, service
center personnel, and dealers.
With the upgrade kit installed, the server will have power system redundancy
that allows the system to operate with a single power supply failure. Also, when
the additional redundant power supply is installed, both the standard and
additional redundant power supply slots become hot swappable.
Please read these installation procedures in their entirety before starting.
CONTENTS
Preparing the System ............................................................................................................................. 4
Removing the Server Side Panels...................................................................................................... 5
Removing the Standard Power Supply and Rear Mounting Plate ..................................................... 7
Removing the Power Supply Retaining Bracket ............................................................................... 8
Removing the Power Supply Blank Mounting Plate ......................................................................... 8
Installing the Upgrade Components..................................................................................................... 10
Installing the Power Controller Board ............................................................................................. 11
Installing Jumpers and Disconnecting the Intrusion Switches......................................................... 13
Installing the LED/Switch Assembly............................................................................................... 14
Installing Interlock Switches ........................................................................................................... 16
Installing the Redundant Power Supplies ........................................................................................ 17
Installing the Server Side Panels.......................................................................................................... 19
Powering Up and Testing the Server.................................................................................................... 19
Troubleshooting............................................................................................................................... 20
NEC
Kit

Advertisement

Table of Contents
loading

Table of Contents