This chapter provides a quick setup checklist to get your 2042G-TRF/6RF up and
running. Following these steps in the order given should enable you to have the
system operational within a minimum amount of time. This quick setup assumes
that your system has come to you with the processors and memory preinstalled. If
your system is not already fully integrated with a serverboard, processors, system
memory etc., please turn to the chapter or section noted in each step for details on
installing specifi c components.
2-2

Unpacking the System

You should inspect the box the 2042G-TRF/6RF was shipped in and note if it was
damaged in any way. If the server itself shows damage you should fi le a damage
claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the 2042G-TRF/6RF.
It should be situated in a clean, dust-free area that is well ventilated. Avoid areas
where heat, electrical noise and electromagnetic fi elds are generated. You will also
need it placed near a grounded power outlet. Be sure to read the Rack and Server
Precautions in the next section.
2-3

Preparing for Setup

The box the 2042G-TRF/6RF was shipped in should include two sets of rail
assemblies, two rail mounting brackets and the mounting screws you will need to
install the system into the rack. Follow the steps in the order given to complete
the installation process in a minimum amount of time. Please read this section in
its entirety before you begin the installation procedure outlined in the sections that
follow.
Chapter 2
Server Installation
2-1
Chapter 2: Server Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

A+ server 2042g-trfA+ server 2042g-6rf

Table of Contents