Installation Instructions - Friedrich ZStar ZQ08 ZQ10 Installation And Operation Manual

115 volts
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions

Read these instructions completely and carefully.
Before You Begin
NOTE TO INSTALLER: Leave these
instructions with the air conditioner after
installation is completed.
NOTE TO CONSUMER: Keep this Installation
and Operation Manual for future use.
Important notes:
It is recommended that proper attire be worn
during installation.
For personal safety, this air conditioner must
be properly grounded.
It is important to have the wall outlet and circuit
checked by a qualified electrician if there is any
doubt as to whether a proper ground exists.
Electrical Data
Line Cord Plug
Power supply cord with
3-prong grounding plug
Tools You Will Need
Phillips-head screwdriver
Flat-blade screwdriver
Ruler or tape measure
Use Wall Receptacle
Standard 125V, 3-wire grounding
receptacle rated 15A, 125V AC
Scissors or knife
Pencil
Level
Hammer
8
CAUTION:
Do not under any circumstances, cut or remove
the third (ground) prong from the power cord.
Do not change the plug on the power cord of
this air conditioner.
Aluminum house wiring may present special
problems–consult a qualified electrician.
Power Supply
Use 15 AMP time
delay fuse or circuit
breaker.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zstar zq10Zstar zq08

Table of Contents