Preparing The Unit For Installation; Before Installation - Friedrich ZStar ZQ08 ZQ10 Installation And Operation Manual

115 volts
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions

Preparing the Unit for Installation

Remove the 2 shipping screws from the back
of the case.
Remove the 2 screws on each side of the
case. Keep these for later use.
Slide the air conditioner from the case by
gripping the base pan handle and pulling
forward while bracing the case.

Before Installation...

Cut the window sash seal to the proper
length. Peel off the backing and attach the
seal to the underside of the window sash.
Window sash seal
Carefully insert the plastic frame guides into
the bottom of the case on each side.
Bottom of
case
Insert the frames for the frame curtains into
the top mounting rail and the frame guides.
Attach the frame curtains to the side of the
case using 4 type A screws
(Type A)
When the frame guides are set, the arrows
Frame
guide
should be pointing toward the back end of
the unit.
12
Shipping screws
(Type A)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zstar zq10Zstar zq08

Table of Contents