Procedure For Installing Caps - Trane RTHD Troubleshooting Manual

Air and water cooled chillers
Table of Contents

Advertisement

Procedure for
installing caps.
10
IPC Overview and Troubleshooting
4 Inspect finished connector. Make sure the red wire matches up with the red
line on the connector. Verify that no wires are twisted in the connector.
Figure 5. Finished Connector
A cap must be installed on the bare end any time the is cut and/or spliced.
1 Always cut in parallel section of wire. If cuts are made on twisted wire,
shorting of the wire pairs will occur. An angle cut is necessary for the proper
installation of the protective cap. Refer to
Right
Figure 6. Wire
Figure
6.
Wrong
RLC-SVB05A-EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rtac

Table of Contents