Unit Installation - Trane YUKON MCV Series Installation Manual

Tall floor split systems 36,000 - 120,000 btu/h cooling only mcv series 50/60 hz
Hide thumbs Also See for YUKON MCV Series:
Table of Contents

Advertisement

Indoor Unit
1. Select a location to route tubing,
wiring and drain pipe between the
indoor and outdoor units.
2. Make a hole in the wall using a key
hole saw or hole-cutting drill
attachment.
The hole should be made at a slight
downward slant to the outdoor side
(Figure 3).
Outdoor side
Indoor side
Figure 3
Before cutting, check that no pipes or
studs are directly behind the place to
be cut. Avoid areas where electrical
wiring or conduits are located.
3. Place the unit on a solid and level
foundation.
4. Tubing, wiring and the drain pipe
can be routed to rear or left and
right side of the unit.
5. To gain access to the electrical
terminals, the drain and the
refrigerant lines, remove the return
air grille and bottom panel.
5.1 Remove a screw at return air grille
(Figure 4).
5.2 Pull the return air grille forward
and lift up to remove it (Figure 5).
5.3 Unscrew at the bottom panel, pull
forward and lift up to remove the
panel. The electrical box will be
on the left hand side, the drain
and refrigerant lines will be on the
right hand side when facing front
(Figure 6).
5.4 Unscrew at the electrical box to
remove the cover, the electrical
terminal will be placed inside the
box (Figure 7).
6. Replace the cover of electrical box,
bottom panel and the return air
grille after the installation of wiring,
tubing and piping is completed.
6
MS_SVN007_EN.p65
Black

Unit Installation

Figure 4
Figure 6
6
Figure 5
Figure 7
MS-SVN007-EN
6/7/06, 10:21 AM