Condensate Drain Piping

-
The drain hose should run straight
down the wall to a level where the
run off will not stain the wall.
-
There should be no traps. Avoid
putting the end of the hose in
water.
-
To conveniently drain the system,
the drain hose must slant
downward, with a slope of at least
1 : 50 to prevent leakage.
8
-
When the drain hose is placed in
the room, insulate the hose with
foam polyethylene to avoid
damage to the ceiling or furniture.
-
After completing installation of
refrigerant lines, wiring and drain
connections, bind the tubing,
wiring and drain hose (check if
local codes permit binding) into a
bundle by using tape at 100 or
200 mm. (4" to 8") intervals. Make
sure the drain hose is at the bottom
of the bundle (Figure 12).
P.V.C. Tape
Insulation Tube
Suction Line Tube
Liquid Line Tube
Water Condensated
Drain Tube
Control Wiring
(P.V.C. Tube)
Power Wiring
Figure 12
MS-SVN007-EN
6/7/06, 10:22 AM
P.V.C.
Conduit