Installation To The Left Or Right Side Of The Machine - Miele T 4362 Operating Instructions Manual

Vented tumble dryer
Table of Contents

Advertisement

Installation - venting
3. Example
A
Wall pipe, with louvred vent
= 1 x 3.8 m Additional duct
length
B/D 2 Elbows, 90°
= 2 x 0.8 m Additional duct
length
C
0.5 m plastic piping
= 0.5 x 1 m Additional duct
length
E
Side connection, left
= 1 m Additional duct length
Effective duct length
Result: A duct diameter of 100 mm is
adequate as the effective duct length is
less than the 20 m specified in Table II.
36
Installation to the left or right
side of the machine
At the rear
The connection is opened at the
factory.
^ Fit one of the venting systems
described on the following pages.
Left or right side of the machine
= 3.8 m
= 1.6 m
= 0.5 m
^ Remove the left or right hand side
cover cap. Do not remove the frame.
= 1.0 m
Refit it in the rear outlet.
= 6.9 m
^ Ensure it is securely in position so
that it cannot fall out when the dryer
is in operation.
^ Fit one of the venting systems
described on the following pages.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents