Installation - extraction ducting
Calculation example
A
Wall pipe, with louvred vent
= 1 x 3.8 m Additional duct
length
B/D 2 bends, 90°
= 2 x 0.8 m Additional duct
length
C
0.5 m plastic piping
= 0.5 x 1 m Additional duct
length
E
Side connection, left
= 1 m Additional duct length
total duct length
Result: A duct diameter of 100 mm is
adequate as the total duct length is less
than the 20 m specified in Table II.
50
Installation to the rear, left or
right hand side of the machine
To the rear
The connection is opened at the
factory.
^ Fit one of the venting systems
described on the following pages.
To the left or right side of the
machine.
= 3.8 m
= 1.6 m
= 0.5 m
^ Turn the cover flap anti-clockwise.
= 1.0 m
= 6.9 m
^ Refit it securely in the rear outlet.
^ Fit one of the venting systems
described on the following pages.