SS-1200-FCAL User Guide
• A trifurcated power cord, as supplied with the SS-1200-FCAL system, must be used in order to safely provide
• If a power cord is not supplied with your SS-1200-FCAL system, a power cord suitable for the country of
• If powered by multiple AC sources, disconnect all supply power for complete isolation.
• In order to comply with applicable safety, emission and thermal requirements no covers should be removed
• The On/Off switches on each Power Supply/Cooling module Only isolate the power from that module. Any
• The power connection must always be disconnected prior to removal of the Power Supply/Cooling module
• Before operating the Power Supply/Cooling module, it must be secured by tightening the retaining screw on
• The subsystem must not be run for extended periods without the ESI/Ops Panel Module being in place.
• A safe electrical earth connection must be provided to the power cord. Check the grounding of the enclosure
• Provide a suitable power source with electrical overload protection to meet the requirements laid down in the
Caution
Rack System Precautions
Ensure that the rack system being used for your SS-1200-FCAL installation meets the following
parameters:
The rack design should incorporate stabilizing features suitable to prevent the rack from tipping forward
during installation.
The rack should comply with the airflow requirements detailed in the technical specification.
The rack should have a safe electrical distribution and grounding system.
Moving and Handling
Disk drives are very susceptible to physical shock but damage may not be immediately obvious.
Please observe the following precautions before moving and handling the enclosure:
• Always spin down devices prior to removing from the enclosure.
• If the SS-1200-FCAL enclosure has been installed in a 19 inch rack which is to be moved, remove all drives
• Keep all plug-in modules packaged to protect them until they are required for installation.
• Take care not to drop any of the plug-in modules or strike them onto a hard surface.
iv
a single power disconnect point.
destination and for use with the SS-1200 system application should be provided. Please refer to
FCAL Technical Specification", on page 9
and All bays must be fitted with either plug-in modules or blanking plates.
other power supply/cooling modules will remain active.
from the enclosure.
the module front panel.
before applying power.
technical specification.
and other plug-in modules and repackage before transporting them separately.
for details.
1.4, "SS-1200-