Pipe insulation:
a.
Place the drainage hose under the pipe.
b.
Use insulating material exceeding 6 mm in
thickness.
-
The drainage hose must slope downwards
slightly in order to allow moisture to drain
away easily.
Ensure that the drainage hose is not
twisted and does not protrude. The end
may not hang in the water.
If the drainage hose is extended with a hose, the section running alongside the indoor unit must be
insulated.
-
If the wire/pipes are on the right hand side, the wires/pipes, power cable and drainage hose must be
insulated and fastened to the back of the indoor unit with a pipe clamp.
A.
Fasten the pipe clamp to the groove.
Mounting plate
B.
Press the clamp to attach it to the mounting plate.
Connecting the pipes
a.
Connect the indoor unit pipes with two nut spanners. Select the
correct tightening moment in order to prevent the pipes, con-
necting pieces and nuts from being deformed or damaged.
b.
First tighten by hand, and then with nut spanners.
Model
Pipe dimensions
S1126, S1135, S1153
Liquid Side (ø6 or 1/4 inch)
S1170
Liquid Side (ø10 or 3/8 inch)
S1126
Gas Side (ø10 or 3/8 inch)
S1135, S1153
Gas Side (ø12 or 1/2 inch)
S1170
Gas Side (ø16 or 5/8 inch)
4
10
Power cable 1
(heat pump)
Pipe clamp
Mounting plate
Tightening
Large pipe
Power cable
Wiring of defrosting
regulator (heat pump)
Push through
here
Pipe clamp
Mounting plate
Nut size
moment
1.8 kg.m
17 mm
3.5 kg.m
22 mm
3.5 kg.m
22 mm
5.5 kg.m
24 mm
7.5 kg.m
27 mm
Insulating pipe
Small
pipe
Drainage hose
Tape
Hook here

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

S1135S1153S1170S125

Table of Contents