Installation - Teledyne 328 Instruction Manual

oxygen analyzers
Table of Contents

Advertisement

Installation

Installation
Installation
Installation
Installation
Note:
Note:
If you have ordered special options and have obtained a copy of
If you have ordered special options and have obtained a copy of
Note: If you have ordered special options and have obtained a copy of
Note:
Note:
If you have ordered special options and have obtained a copy of
If you have ordered special options and have obtained a copy of
this instruction manual before the instrument is built and fully
this instruction manual before the instrument is built and fully
this instruction manual before the instrument is built and fully
this instruction manual before the instrument is built and fully
this instruction manual before the instrument is built and fully
tested, be aware that special designs and requirements may cause
tested, be aware that special designs and requirements may cause
tested, be aware that special designs and requirements may cause
tested, be aware that special designs and requirements may cause
tested, be aware that special designs and requirements may cause
last-minute changes in the sample system, component placement,
last-minute changes in the sample system, component placement,
last-minute changes in the sample system, component placement,
last-minute changes in the sample system, component placement,
last-minute changes in the sample system, component placement,
conduit connections, etc. which will eventually be covered by an
conduit connections, etc. which will eventually be covered by an
conduit connections, etc. which will eventually be covered by an
conduit connections, etc. which will eventually be covered by an
conduit connections, etc. which will eventually be covered by an
addendum in the front of the manual, and by new drawings. If your
addendum in the front of the manual, and by new drawings. If your
addendum in the front of the manual, and by new drawings. If your
addendum in the front of the manual, and by new drawings. If your
addendum in the front of the manual, and by new drawings. If your
intention is to install services, accessories, etc., using preliminary
intention is to install services, accessories, etc., using preliminary
intention is to install services, accessories, etc., using preliminary
intention is to install services, accessories, etc., using preliminary
intention is to install services, accessories, etc., using preliminary
information, then you must be aware that changes to your installa-
information, then you must be aware that changes to your installa-
information, then you must be aware that changes to your installa-
information, then you must be aware that changes to your installa-
information, then you must be aware that changes to your installa-
tion may eventually be required. Specially-engineered systems will,
tion may eventually be required. Specially-engineered systems will,
tion may eventually be required. Specially-engineered systems will,
tion may eventually be required. Specially-engineered systems will,
tion may eventually be required. Specially-engineered systems will,
of course, be bound by the stipulations of the agreement; neverthe-
of course, be bound by the stipulations of the agreement; neverthe-
of course, be bound by the stipulations of the agreement; neverthe-
of course, be bound by the stipulations of the agreement; neverthe-
of course, be bound by the stipulations of the agreement; neverthe-
less, unforeseen factors may in some cases necessitate amend-
less, unforeseen factors may in some cases necessitate amend-
less, unforeseen factors may in some cases necessitate amend-
less, unforeseen factors may in some cases necessitate amend-
less, unforeseen factors may in some cases necessitate amend-
ments to the agreement by mutual consent.
ments to the agreement by mutual consent.
ments to the agreement by mutual consent.
ments to the agreement by mutual consent.
ments to the agreement by mutual consent.
The analyzer should be installed in an area that is sheltered from the
elements. The instrument case of general purpose models is not to be
considered water tight (although the model 328R has a sealed, explosion-
proof enclosure, and the Analysis Section of the model 327R has a sealed,
explosion-proof enclosure). In areas where the ambient temperature is
expected to drop below 0 °F, auxiliary heating must be provided.
In analyzers with a separate probe unit, install the probe with a suitable
sample system in an area that is protected from the elements and from RFI.
The temperature limits are the same as those specified for the sensor, but a
constant temperature will increase accuracy. The sample system must
provide a flow rate of approximately 1000 ml/minute at a constant tempera-
ture. Also, the sample system should include some means of introducing a
span gas.
Outline Diagrams showing the location and identification of the gas line
and electrical conduit connections, as well as the physical dimensions of the
analyzer, are included in the Drawings Section at the rear of the manual.
TAI suggests that the mounting holes be line drilled, using the analyzer
itself as a template, after the panel cutout has been made. If the instrument
Installation
Installation
Installation
Installation
Installation
3.1 Location
3.1 Location
3.1 Location
3.1 Location
3.1 Location
Teledyne Analytical Instruments
Model 326/327/328
Model 326/327/328
Model 326/327/328
Model 326/327/328
Model 326/327/328
3-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

327326

Table of Contents