Installing Offsets; Optional Equipment Considerations; Blower - Superior BC36MH Installation Instructions Manual

Wood-burning fireplaces
Table of Contents

Advertisement

Underside Of Chimney
Figure 33
FTF8-E30 Return Elbow*
Chimney Section (S)
FTF8-30 Offset Elbow*
*Part of Offset/Return Package Model FTF8-ES30
Figure 34

INstAllINg oFFsEts

First, review the Offset Elevation Chart and
Figure 34 for reference.
step 1. Determine the offset distance where
chimney is to pass through the first
ceiling-dimension "A." To find this
point on your ceiling, first determine
the center point for a vertical chimney
following the instructions for vertical
installation.
Measure height to the ceiling from the
top of fireplace-dimension "B." Use
the appropriate Offset Elevation Chart
to find dimension "A." Mark point
where you will drive your nail to show
the center point for your offset ceiling
cut.
step 2. Proceed by using the Straight Up In-
stallation Instructions for cutting and
framing ceiling and roof openings.
Note: See Framing and Dimension Chart for
the sizes of the ceiling and roof openings. The
size of the roof opening varies with the degree
of pitch of the roof.
14
offset Elbow Assembly
Offset elbows install the same as chimney
sections. First, snap the inner section INTO the
preceding inner section of flue. Check connec-
tion by pulling up slightly to ensure a tight fit.
Next, the outer sections snap lock OVER the
preceding outer section of chimney. Again,
check outer section by pulling up slightly to
ensure proper connection is made.
Return Elbow Assembly
Return elbows install the same way as round
terminations and stabilizers:
step 1. Hold return elbow over top of last
step 2. Center inner slip section into inner flue
step 3. Center outer-locking section over outer
B
step 4. Pull up slightly on return elbow to ensure
A
step 5. Secure support straps to framing
Figure 35
Notes:
• The return elbow assembly performs the
same function as a stabilizer. Consider this
when determining the need for a stabilizer.
• Do not apply excessive pressure to any
subsequent chimney section following return
elbow assembly when installing. Ensure that
each subsequent chimney section is securely
attached by testing as noted above.
oPtIoNAl EquIPMENt
coNsIdERAtIoNs
Blower Kit
A Blower Kit model BFK36 is preinstalled,
standard, on model BCD36MH and is available
as an option for model BC36MH. The optional
Blower Kit can be installed prior to or after
installation of the fireplace.
Note: These fireplace models are not supplied
with an optional wall switch (FWSK) for fan
operation. BFK36 blower kits may be operated
with their integral blower (On/Off) switch.
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
chimney section.
pipe-slip down.
chimney pipe. Push down until locking
joint has firmly engaged.
locking joint has firmly engaged.
members by nailing under tension in
sheer (Figure 35).
Return
Elbow
IMPoRtANt
the fireplace must be wired to
the house electrical system at the
time of installation in order for
the fans to operate, (see Figures
36 and 37).
POWER TO THE FIREPLACE
The Optional Blower Kit
Operates on 115 volt 60 Hz
150 watts AC
GROUND
WIRE
COVER PLATE
Replace Cover Plate
House Wiring Must Be Secured
After Electrical
With The Appropriate Electrical
Hook-Up
Connector To The Fireplace
Convenience Outlet Wiring
Figure 36
BLOWER THREE
PRONGED PLUG TO
GROUNDED OUTLET
Figure 37
Note: The utilization of fans will increase the
air flow around the firebox. However, only
a minimal increase in heat output should be
anticipated.
IMPoRtANt
this fireplace is not intended
to be used as a substitute for a
furnace to heat an entire home.
use for supplementary heating
only.
The BFK36 Blower Kit is design certified by
OMNI-Test Laboratories for use with these
appliances.
HOUSE
WIRING

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bcd36mh

Table of Contents