Page 1
Follow them carefully to install the scale, then refer to the Operating Guide for full details of how to operate the machine. For the N421 (2kg) scale… go to page For the N521 (2kg), N621/N620 (5kg), N721/N720 (12kg) scales… go to page For the N921/N920 (35kg) scales… go to page...
Page 2
Meter Cable (only supplied if you ordered a Pitney Bowes Postage Meter at the same time as your scale)
Page 3
N421 install Installation Instructions 4. Install the Rate PROM 5. Locate the plug ports If you have been supplied with a Locate the plug ports under the front PROM, slide it into its slot ensuring the of the scale and plug in the small end opening in the PROM handle is in the of the power cable.
Page 4
N421 install Installation Instructions 8. Level the scale Level the scale by turning the scale feet until the levelling bubble is centred Bubble and the scale does not wobble. must be in centre. Adjustable Feet (4) 9. Connect the meter cable to the postage meter If using a postage meter, connect the If your postage meter is fitted with an large end of the meter cable to the the...
Page 5
You have successfully installed your Pitney Bowes Scale. For information on using the scale, refer to the Operating Guide. If you have existing Pitney Bowes equipment that needs to be returned, follow the instructions included in your ‘Information Pack’ now.
Page 6
1. Make sure you have: Scale Power Supply Unit (in its own box) User Guide Rate PROM Meter Cable (only if you ordered a Pitney Bowes Postage Meter at the same time as your scale) Meter Cable Power Supply Rate PROM Unit 2.
Page 7
Refit platform. 5. Locate the plug ports Locate the plug ports under the front of the scale and plug in the small end of the power cord. N620, N621, N720, N721 N521 Page 7...
Page 8
Installation Instructions 6. Connect the postage meter cable If using a Postage Meter, plug the small end of the meter cable into the scale. N521 N620, N621, N720, N721 7. Tuck the cable(s) into the cable guides Tuck the cable(s) under the guides on the bottom of the scale. Turn the scale back onto its feet.
Page 9
N500/600/700 series install Installation Instructions 9. Connect the meter cable to the postage meter If using a postage meter, connect the If your postage meter is fitted with an large end of the meter cable to the the optional Datalink unit, connect the meter as shown.
Page 10
You have successfully installed your Pitney Bowes Scale. For information on using the scale, refer to the Operating Guide. If you have existing Pitney Bowes equipment that needs to be returned, follow the instructions included in your ‘Information Pack’ now.
Page 11
Scale control module and platform Power Supply Unit (in its own box) User Guide Rate PROM Meter Cable (only if you ordered a Pitney Bowes Postage Meter at the same time as your scale) Power Supply Rate PROM Meter Cable Unit 2.
N900 series install Installation Instructions 3. Assemble the 4. Remove the control weighing platform module cover Place the cover on the weighing Remove the cover from the top rear platform. Press down on each corner of the control module and set aside. to be sure it is completely seated.
Page 13
N900 series install Installation Instructions 7. Locate the plug ports Locate the plug ports under the front of the control module and plug in the small end of the power cable. 8. Connect the postage meter cable If using a Postage Meter, plug the small end of the meter cable into the control module.
Page 14
N900 series install Installation Instructions 10.Connect the meter cable to the postage meter If using a postage meter, connect the If your postage meter is fitted with an large end of the meter cable to the the optional Datalink unit, connect the meter as shown.
Page 15
You have successfully installed your Pitney Bowes Scale. For information on using the scale, refer to the Operating Guide. If you have existing Pitney Bowes equipment that needs to be returned, follow the instructions included in your ‘Information Pack’ now.