Hitachi C 10FCD Instruction Manual page 11

Compound
Table of Contents

Advertisement

Available languages

Available languages

2. Releasing the plunger handle
Fig. 5-a
When the power tool is prepared for shipping, its main parts are secured by a plunger handle. Move the
handle slightly so that the plunger handle can be disengaged and adjusted as indicated in Fig. 5-b.
NOTE:
Lowering the handle sloghtly will enable you to disengage the plunger handle more easily
and safely.
The lock position of the plunger handle is for carrying and storage only.
For transportation purpose, grasp the handle (see Fig. 1) with one hand and hold the base at the left end
grip section with the other hand to carry.
3. Installing the dust bag, miter handle, extension wing, stock stop and vises.
(The extension wing and stock stop are optional accessories).
Attach the dust bag, miter handle, extension wing, stock stop and vise assembly as indicated in Fig. 1
and Fig. 2.
(1) Assembly of clamp lever
Handle
Clamp
Collar
Lever
Screw Spring
Fig. 6
Screw
Clamp Lever
Fig. 7
4. Installing the extension stay
(1) Insert the extension stay into the hole of the base.
(2) Fasten the two 5 mm machine screws and fix an extension stay as indicated in Fig. 2.
Plunger Handle
During transport, fit the
plunger handle into the
deep slot.
NOTE: This position is not be
used for any cutting
operation.
q Insert spring and screw into the hole of the clamp lever
as shown in Fig. 6.
w Assemble the clamp lever to the handle collar, then
tighten the screw as shown in Fig. 7.
5 mm Hex. soc. hd. cap bolt (C)
(Stopper for 0°)
During operation fit the
plunger handle stoppers
into the shallow slot.
Plunger Handle
Pull out to disengage.
Rotate the knob 1/4 turn
and fit the pin stoppers
into the shallow slot.
Fig. 5-b
English
Clockwise
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents