Installationinstructions; Unpacking Your Dryer - Haier HLF103Q User Manual

Hide thumbs Also See for HLF103Q:
Table of Contents

Advertisement

Installation Instructions
Select a suitable location for the dryer on a hard even surface away from direct
sunlight or heat source e,g, radiators,
baseboard
healers, cooing
appliances
etc.
Any floor unevenness should be corrected with the leveling legs located on the
bottom of the dryer.
TooJs
and
Paaterials
Required
, Phillips head and fiathead screwdrivers
- CharmeFIock
adjus_ble
pliers
- 1/2
inch open end wrencls
, Carper_er_
level
• Measuring
tape (12ft. rain.)
Duct tape
• Rigid or flexible metal 4 inch (10.2 cm) duct
, Vent hood
EJec_r_ca[ Requirement.s
Power
Supply:
3 or 4 wire, 240 VotL 30 Amp, 60Hz,
1 Phase
Power
Supp|y
Cord
Kit= (not supphed when sold m the United Sta_es)
[he dryeJ MIJST emplr_y a 3 conductor
po_._er supply cord NEMA 10 30
type SRD] rated at 240 Volt AC minimum
30 Amp,, wtlh 3 open end
spade lug connectors with upturned ends or closed loop oonnecl.o[s and
marked for use with clothes dryers, if being installed in a manufactured
(mobile) home, the dryer MUST employ
a 4Conductor
power supply cord
NEMA 14-30 type SRDT or ST (as required)
raled at 240 VoBt AC
minimum
30 Amp,, with 4 open end spade lug conr_ctors
with
uptamed
ends or clcead loop connectors and marked for use with clothes
dryels.
See Eleclrtcal Conr_clJons for A 4-Wire
System.
Unpacking
rYour
Dryer
1. Remove all packaging
material. 1"his includes the foam base and all
adhesive tape holding the dryer accessories inside and ouLside.
2. Inspect and remove any remains d packaging,
tape Or p_inted
materials
before using the dryer.
1 5

Advertisement

Table of Contents
loading

Table of Contents