Installation Instructions - GE PGP990 Owner's Manual & Installation Instructions

Gas downdraft
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
PREPARATION
TOOLS AND PARTS NEEDED
• Largeflat-blade
screwdriver
• Phillips screwdriver
• 3/8" socket and ratchet
Saw
• Carpenter's square
• Pipe wrench
• Gas line shut off valve
• Pipe joint sealant for use with gas connections
that resists action of LPgas
For flexible connection where local codes permit:
• Flexible metal tubing (same 3/4" or 1/2" I.D. as gas
supplg line)
• Flare union adapter for connection to supplg line
(3/4" NPTx 3/4" I.D.or 1/2" NPTx 1/2" I.D.)
• Flare union adapter for connection to regulator
(1/2" NPT x 3/4" I.D. or 1/2" I.D.)
For rigid connection:
• Pipe fittings as required
IMPORTANT
Motor Clearance-Provide
2" min. (5.1 cm) cabinet
clearance to motor for cooling purpose.
NOTE:Where possible, 6" (15.2 cm)is recommended
for motor/blower service.
Side Clearance-Grills
installed near a side wall should
allow a minimum clearance of 8" (20.3 cm).
You must allow room enough to remove and empty
grease container(s).
CAUTION:Warranty is void on equipment installed other
than as recommended by GE.Recommended wall
caps and transitions must be used for proper
operation and installation.
PREPARING FOR INSTALLATION
Tie down
bo t on
each end
"__
Pressure
Regulator
.
_)JJ__'k
I
Wiring
Box Cover
*Blower
can be swiveled
90°/_"_
Grease
Container
i
lsAs-
2.38 cm
Minimum
Clearance
17/s " Hin.
4.76 cm
Select appropriate duct
cutout. (See ducting
installation instructions.)
4_16"
10.64 cm
18VY/
_
_1
I Appliance
47cm
_t"'t<h------_
! Pressure
Minimum
,L!.I
II _
-"1"
Regulator
Clearan:___
__
_L--I
I
'"_-
Grease
2"
_
__
Container
5.08 cm_q r'-14½ _,,_
127/8 , ,_q
Minimum
36.83 cm
32.7 cm
Clearance
* Blower mug be rotated for horizontal or vertical direction bg loosening
nuts around blower inlet. Accessible inside ventilation chamber.
2O

Advertisement

Chapters

Table of Contents
loading

Table of Contents