Chapter 2 Hardware Installation - TYAN Transport GS14 (B5121G14S2 Manual

Table of Contents

Advertisement

2
Hardware Installation
This chapter, which is divided into two sections, provides instructions on the hardware
installation of the system. System Assembly section illustrates how to assemble each
component of the system. Rack Mounting section describes the procedures for
mounting the system into the rack. You can use the system assembly flowchart and the
chart next to determine the proper sequence for removing or installing components to
the server.
System Assembly
Start
Rack Mounting
Cabinet Cover
CPU and Heatsink
Hard Disk Drive
DIMM
Cabinet Rails and Ears
Cabinet into the Rack
Locking Tab
11
http://www.TYAN.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Transport gs14B5121g14s2

Table of Contents