Servicing - GE AZ75H12EACM1 Owner's Manual And Installation Instructions

Vertical air conditioner
Table of Contents

Advertisement

Installation
Instructions
[] FINAL CHECK
Review this Checklist
before
restoring
power:
• Correct
line voltage?
• Single circuit
only?
• HVACR _'pe breaker/fllse?
• Ductwork
connected?
• Case and unit level?
• Wdl plenum
caulked?
I,evel? Flashing?
• Drain
connected?
• _4all them_ostat
wired correctly?
• Unit wi_ed correcflv?
[] CONNECT
POWER
1. If all tile above items are correct,
tm'n tile power on
at tile main service panel.
2. Turn tile unit power switch, on tile fl'ont of tile unit,
to ON by pressing
the top of the switch in.
SERVICING
./k WARNING:
Before
ser\icing,
switch power
off at the service
panel
and
lock the
area
to prevent
power
fl'om
being
switched
on
accidentally.
When
the area
cammt
be locked,
securely
fasten
a prominent
warning
device,
such
as a tag, to the service
panel.
NOTE:
We strongly
recommend
that any se_Mcing be
pe_tmmed
bv a qualified
individual.
For ease of service, tile trait can be removed
fl'om
the case:
1.
Unplug
tile power
cord
and
disc(mnect
tile wall
them]ostat
C()IlIlec[i()IIS,
2. Raise
tile top
duct
by turning
all fl)m" case
top duct
a(!iusting
screws
co/mterclockwise,
3. Remove
the fl'ont
case
panel,
4.
Remove
tile fl'ont
and/or
side
case-to-refit
gro/mding
scre_,
if present.
5. Slide
the
unit
out
ot the
case.
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents