Servicing - GE 49-7419-2 Owner's Manual And Installation Instructions

Zoneline vertical heat/cool and heat pump models
Table of Contents

Advertisement

FINAL CHECK
8
Review this Checklist before restoring power.
• Correct line voltage?
• Single circuit only?
• HVACR type breaker/fuse?
• Ductwork connected?
• Case and unit level?
• Wall plenum caulked? Level? Flashing?
• Drain connected?
• Wall thermostat wired correctly?
• Unit wired correctly?
CONNECT POWER
9
1. If all the above items are correct, turn the power on
at the main service panel.
2. Turn the unit power switch, on the front of the unit,
to ON by pressing the top of the switch in.
Installation Instructions

SERVICING

WARNING:
switch power off at the service panel and lock the
area to prevent power from being switched on
accidentally. When the area cannot be locked,
securely fasten a prominent warning device, such
as a tag, to the service panel.
NOTE: We strongly recommend that any servicing be
performed by a qualified individual.
For ease of service, the unit can be removed from
the case:
1. Unplug the power cord and disconnect the wall
thermostat connections.
2. Raise the top duct by turning all four case top duct
adjusting screws counterclockwise.
3. Remove the front case panel.
4. Remove the front and/or side case-to-unit
grounding screw, if present.
5. Slide the unit out of the case.
22
Before servicing,

Advertisement

Table of Contents
loading

This manual is also suitable for:

Az75h18eacZoneline 7500 series

Table of Contents