NOTE: A bypass must be fitted as far as possible from the boiler if thermostatic radiator valves are fitted throughout.
Key
1. Filling point C.H.
2. Temporary connection
3. Cold water supply
Gas
Cold water
1001
Additional expansion vessel C.H.
Filling
point C.H.
Fig. 6
Fig. 7
(if required)
Bypass
11