Connections For Engine Tests. Breaker Point Conventional Ignition Systems - Craftsman 161.210400 Owner's Manual

Engine analyzer for 12 & 24 volt systems
Table of Contents

Advertisement

v_,a_,.,/l_ll_lr'1_,.
I IUI_I_'.'_
run
r-t_l_C.lll_iL
I r..,.._ t O
BREAKER
POINT
CONVENTIONAL
IGNITION
SYSTEMS
I,,
METER ZERO ADJUSTER.
Before
con-
necting
any
test
leads,
always
check
meter
po_nter zero
position,
if not
on
zero,
slowly
rotate
adjuster
with
pro-
per size flat
screwdriver
and set point-
er on zero
line.
2.
LEADS.
insert all
three
test
leads
into matching
color
sockets on panel.
Connect
leads as illustrated
below.
3.
Install
battery
post adapter
on the
negative
ground battery
terminal
as
shown.
4,
Connect
RED clip to battery
positive
(+) termlnal,
5.
Connect
BLACK clip
to battery
neg-
atlve
(-)
GRD terminal,
6_
,
,
9.
10.
Connect
the GREEN
clip to the dis,.
tr_butor
termlnai
on call
primary.
Attach
RPM induction
pickup
to a
spark
plug cable
as close
to dlstrtbu-
tar cap as possible.
,Jaws
must be
fuliy
closed.
DO
NOT
cc_nect
OHMS
clip.
I
Engine must be at operating
tempera-
ture before
testing,
Proceed with
tests
as outt_ed
in this
manual.
Starter Amp shunt must remain
closed
at all times except
for charging sys-
tem test as indicated.
Damage to
Battery Adaptor
can occur
if the
above instruction
is not followed,
CLOSE STARTER
SHUNT FOR
STARTERAMPS
OPEN FOR
CHARGING
AMPS
®
RED
JAWS
MUSTCLOSE
SO
UPPERAND
LOWER
yPLUG
PoLE
P,ECES
TOUt. ACH'o'r.ER
®
TACH PICK-UP
MUST BE AS
CLOSE TO DISTRIBUTOR
CAP
AS POSSIBLE
WIRE
TO
E
THIS
GAP
tEEN
TO GROUND
ON
ENGINE
iSE NUTS
MUST
_-_
BE TIGHTENED
WITH
A WRENCH.
TI
EN
THIS SCREW
I'O STARTER AND
ALTERNATOR
FIGURE
RED
SCREW POST INTO BATTERY
TERMINAL BEFORE INSTALLI
BATTERY POST ADAPTER,

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents