Equator EZ 1710 V Owner's Manual page 12

Front loading combo washer-dryer
Hide thumbs Also See for EZ 1710 V:
Table of Contents

Advertisement

Connection the vent hose
For EZ 1710 V, the machine vents the moist hot air out of
the unit and require a vent hose to be installed, To install
the vent hose,
Screw the vent hose 2 into the flange 1(Fig.5).
RECESSED, CLOSET AND ALCOVE
The machine may be installed in a recessed area, closet or alcove.
The installation spacing is in inches and is the minimum acceptable.
Additional spacing should be considered for easy installation, servicing and compliance with
local codes and ordinances.
Closet installation must be exhausted.
Other installations must use the minimum dimension indicated.
? Additional clearances for wall, door and floor molding may be required.
? ? Additional space is needed when an external exhaust elbow is used.
The closet's front door must be a shutter, and the clearance between the slats must be more
than 1/3 area the front door.
For EZ 1710 V , see Fig 6,
For EZ 3710 CEE , see Fig 7.
11
( Fig.5)
INSTALLATION (Instructions)
Combo Washer- Dryer Owner's Manual
( Fig.6)
( Fig.7)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ez 3710 cee

Table of Contents

Save PDF