Craftsman 17125455 Operating Instructions Manual page 6

Industrial dovetail jig
Table of Contents

Advertisement

ALTHOUGH YOUR INDUSTRIAL DOVETAIL JIG
COMES A SSEMBLED,
THEFOLLOWING ASSEM-
BLY INSTRUCTIONS ARE BEING INCLUDED FOR
REFERENCE PURPOSES SHOULD IT BECOME
NECESSARY FOR YOU TO DISASSEMBLE AND
REASSEMBLE THE DOVETAIL JIG
PROCEED TO THE SECTION ALIGNMENT OF
THE TEMPLATES AND THEN CONTINUE WITH
THE SECTIONS FOLLOWING ALIGNMENT OF
THE TEMPLATES
THE TEMPLATES MUST BE ALIGNED BEFORE
ANY ROUTING tS TO TAKE PLACE
TOOLS
REQUIRED
- A medium
sized Phillips
screwdSver
° A smafl or medium
adjustable
wrench
ASSEMBLY
OF THE RIGHT SIDE TEMPLATE
SUPPORT
TO THE DOVETAIL
BASE
1 Ptace the dovetail base topside down on a fiat surface
2 insert one of the 5/16-18 x 2" long round head square
FIGURE
1
neck botts into the slot in the right side of the base
(NOTE: The right side of the base is identified
by the
words RIGHT SIDE molded into it )
3 Place a 11/32" t D, x 7/8" OD
washer
onto the bolt as
shown in Figure
1
4 Thread
a 5/16-18
hex nut onto the bolt, as shown,
until
it bottoms
out against
the washer
5 Back off the nut from the washer
between
1/4 and 1/2
10_32X 5/8" LONG PANHEAD
MACHINE SCREW
HEXES MUST LINE UP
5t16-18
X 2" LONG
ROUND
HEAD
SQUARE
NECK
BOLT
t3/64"
I D X 9/t6"
O D WASHER
""
# 10_32 HEX NUT
"" BACK OF DoVETAiL BASE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents